ZLJ-1400 underground drilling rig is suitable for coal mine tunnel engineering drilling and its drilling depths are 150m and 200m.
Parameters| Basic Parameters | Drilling Depth | 200m | 150m | ||||
| Borehole Diameter | Φ42mm | Φ50mm | |||||
| Drill Rod Diameter | Match with borehole | ||||||
| Power Unit Parameters | Gear 1 | Gear 2 | Gear 3 | Gear 4 | Reverse Gear | ||
| Output Rotation Speed (Forward and Reverse) | 111r/min | 227r/min | 402r/min | 820r/min | 135r/min | ||
| Rated Maximum Output Torque | 1400N·m | ||||||
| Vertical Feed Stroke | 500mm | ||||||
| Main Winch Parameters | Hoisting Capacity( Single Rope, First Floor) | 12KN | |||||
| Maximum Single Rope Hoisting Speed | 2.19m/min | ||||||
| Rope Diameter | 10mm | ||||||
| Rope Capacity | 30m | ||||||
| Power Parameters | Motor Model | YBK2-160L-4 | |||||
| Power | 15KW | ||||||
| Rotation Speed | 1460r/min | ||||||
China Geological Equipment Group Co., Ltd.
Add.: 5th Floor, Botai Mansion, No. 221 Wangjing Xiyuan, Beijing 100102
Contact Us:
Tel: +86-510-83769831