It is common to have issues such as shallow hole, short distance between holes and high frequency of relocation during the drilling projects. Dismantling manually and relocating it not only intensify the labor works but increasing the time taken for the drilling therefore reducing the construction efficiency. To solve these problems, we designed a drilling rig suitable in construction projects which require frequent and fast mobility. It is applicable in various geological survey projects and geological exploration at the shallow core for the construction of railways, highways, bridge tunnels, foundation for dam of the hydropower stations, industrial and civil buildings, national defense construction and so on. The drilling depth is 30-100m.
ParametersBasic parameters | Drilling depth | 30~100m | |||
Drilling diameter | Φ150~Φ75mm | ||||
Diameter of drilling pipe | Depends on the choices on drilling hole | ||||
Power head | 1st gear | 2nd gear | 3rd gear | 4th gear | |
Rotational speed output (clockwise) | 90r/min | 191r/min | 360r/min | 600r/min | |
Rated maximum torque output | 1000N.m | ||||
Up down feeding stroke of the power head | 450mm | ||||
Winch | Lifting ability (Single rope 1st layer) | 14.7KN | |||
Maximum lifting speed of single rope | 2.08m/min | ||||
Steel rope specification | 11mm | ||||
Capacity for the steel rope | 25m | ||||
Power | Diesel motor model | ZS1100M | |||
Power | 12KW | ||||
Rotational speed | 2200r/min |
China Geological Equipment Group Co., Ltd.
Add.: 5th Floor, Botai Mansion, No. 221 Wangjing Xiyuan, Beijing 100102
Contact Us:
Tel: +86-510-83769831